Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Assignment 2, Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   


 

2-59.  Automated  shore  interface  (ASI)  tapes are sent to what activity for breakdown  by  UIC? 1. NAVSEA 2. NAVSUP 3.  NAVMASSO 4. SPCC 2-60.  The  Ship’s  Configuration  and  Logistics Information  System  (SCLSIS)  applies  to all ships in the Navy. For what specific  time  period  does  the  SCLSIS apply to a particular ship? 1.  During  initial  construction  only 2.  Between  major  overhauls  only 3. While in the yards only 4. For the entire active life 2-61.  What  instruction  gives  responsibility to  NAVSEA  for  applying  the  SCLSIS? 1.  NAVSEAINST  909-700 2.  NAVSUPINST  4400.179 3.  OPNAVINST  3130.32 4.  SECNAVINST  4130.2 2-62.  During  an  overhaul,  what  individual  or activity  is  responsible  for  reviewing all  configuration  changes  before submitting  the  information  to  the SPCC? 1. Configuration data manager (CDM) 2.  Integrated  logistics  overhaul  (ILO) 3. Naval supervising activity (NSA) 4.  Onboard  technician 2-63. What is the primary objective of an ILO? 1. 2. 3. 4. To make sure all material is on board To make sure there is enough storage space on board To make sure the ship’s true configuration  is  supported  by logistics  support  documentation To make sure the supply department has ordered all parts 2-64. 2-65. 2-66. 2-67. The focal point for keeping track of receipts  of  all  configuration  changes that apply during the overhaul is what  group  or  activity? 1. Ship 2. NSA 3. Shipyard 4. ILO team To make sure an accurate and timely documentation  of  all  configuration changes is made, you must work closely with the ILO team, shipyard, and  the  NSA. 1.  True 2. False The  documentation  of  configuration changes that takes place as part of the  shipyard  overhaul  effort  is  the responsibility  of  what  group  or activity? 1. ILO team 2. NSA 3. SPCC 4. Ship Which  of  the  following  individuals  is responsible  for  taking  the  first action  in  processing  COSAL  changes? 1. 2. 3. 4. The  technician  responsible  for  the maintenance  of  the  equipment The  work  center  supervisor  who validates  equipment  changes The department head who is responsible  for  the  equipment configuration  change  request  (CCR) The supply support center supervisor whose job it is to validate  equipment  CCRs 14

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business