9.
Facility action codes
NEW - New recruiting office
RELO - Relocation from one location to another
EXP - Expansion to an existing Facility
CLOSE - Upgrade an existing facility
REDUCE - Reduce in area an existing facility
10.
Facility upgrade codes
1 - Provide and install exterior signs
2 - Install floor-to-ceiling partitions
3 - Install partitions in office area
4 - Install acoustical tile ceiling
5 - Install lowered ceiling (acoustical tile)
6 - Repair ceiling
7 - Install adequate lighting
8 - Install/repair heating/AC system
9 - Install water cooler
10 - Install/repair restroom facilities
11 - Repaint
12 - Construct secure storage facilities
13 - Repair floors/install floor covering
14 - Electrical outlets/install window screens
15 - Soundproof mechanical room
16 - Repair doors or windows
17 - Miniblinds
18- Repair/replace wallpaper
19 - Install windows
20 - Install doors
21 - Install deadbolt locks
22 - Other
11. Comments/Recommendations
Figure 4-1B.Facilities information sheet (back).
4-4
|