Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Assignment 2, Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   


 

2-25. From what command should you request an APL or AEL for a piece of equipment installed  on  your  ship? 1.  FMSO 2.  Squadron 3. SPCC 4. Another ship 2-26.  What  statement  defines  a ship’s operating  cycle? 1. Ship’s time spent underway 2.  Period  of  time  between  overhauls 3.  Actual  overhaul  time  period 4. Ship’s time spent in port 2-27.  When  you  submit  configuration  changes to SPCC, what file is updated? 1.  COSAL 2.  Addition  and  deletion 3. WSF 4.  Equipment 2-28. What manual provides you with a suggested  format  for  a  checkoff  list and  record  log? 1. COSAL Use and Maintenance Manual, SPCCINST  4441.170 2.  NAVSUP  Manual  P-485 3.  NAVSUP  Manual  P-4998 4. 3-M Manual,  OPNAVINST  4790.4 2-29.  At what specific frequency should you review  the  COSAL  maintenance  records? 1. Once a month 2. Twice a month 3. Once a day 4. Once a week 2-30.  What  publication  specifies  the  data  to be  entered  on  a  CASREP  requirement? 1. NAVSUP Manual P-485 2. Navy  Warfare  Publication  10-1-1O 3.  TYCOM  publication 4. Standard  Organization  and Regulations of the U.S. Navy, OPNAVINST  3120.32 IN ANSWERING QUESTIONS 2-31 THROUGH 2-34, SELECT THE SPECIFIC DATA IN COLUMN B THAT MUST  BE  VERIFIED  FOR  THE  CASREP  SCREENING REQUIREMENT LISTED IN COLUMN A. A. SCREENING B. SPECIFIC  DATA REQUIREMENTS 2-31.  Down  equipment 1. Item NIS or NC 2-32.   Technical   manual   2.   NSN 2-33.  Stock  battery  and  3.  Nomenclature, ISL serial 2-34.  ML-N 4. Type, model, serial 2-35.  You  discover  an  installed  equipment on board that is not supported in your  COSAL. After obtaining an APL, you should take what first step in processing  this  addition  to  the COSAL? 1. Process only those items that have a quantity listed in the Maint COlumn 2.  Determine  the  number  of  installed components 3.  Compare  against  actual  installed components 4. Compare against the actual installed  equipment 2-36.  When  you  have  new  equipment  installed aboard your ship, the APL should be reviewed  for  which  of  the  following reasons? 1.  Verify  quantity  installed 2.  Check  maintenance  capability  code 3.  Determine  allowance  table 4. All of the above 2-37. In reviewing a new APL, you discover that  your  maintenance  capability is 4. What other capability level items  are  you  therefore  authorized to  carry? 1. 2 and O only 2. 2, 3, and O only 3. 2, 3, 4, and O only 4. 2, 3, 4, 5, 6, and O 11

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business