of the interim APL. The allowed quantity
shown
on the interim APL for a PMR item is additive
to any existing
allowance in the SNSL/ISL.
SUMMARY
LIST OF COMPONENT/EQUIP-
AGE
CHANGES.-
During
the last month of
the availability,
but no later
than
end of
availability
(EOA) minus 10 working
days, the
NSA consolidates
all
configuration
changes
processed to date into a master SLCC and SLEC.
No later than EOA, two copies of the master
SLCC and SLEC are delivered to the ship. The
SLCCYSLEC is always typed. It is formatted in
service application
sequence for hull, mechanical,
electrical, ordnance, and electronics (HMEO&E).
This document serves as a supplement to the ships
COSAL
Index.
SLCC/SLEC REVISED PAGES.-
Since addi-
tional configuration
changes may be identified for
various reasons by the NSA after the SLCCISLEC
printing,
a method of documenting these changes
and updating
the SLCCBLEC
is required.
The
NSA is responsible
for forwarding
the revised
pages to the holders of the SLCCXSLEC with all
necessary
associated
data (AAP,
APL,
and
NAVSUP Form 1109 cards) to the ship.
During
availabilities
various
activities
are
involved
in maintenance
of the
COSAL.
However, the ship is ultimately
responsible for the
accuracy of the COSAL. Refer to chapter 5 of the
COSAL
Use and Maintenance
Manual,
SPCC-
INST
4441.170, for a complete description
of
COSAL maintenance procedures used during ship-
yard availability periods that do not include an ILO.
2-27
|