| |
Figure 7-4.-Sample requisition receipt, and issue documents for controlled equipage.
Annual inventories must be completed by 15 March.
document which may be required as an addendum to the
This is so that post-inventory actions can be
type commanders copy of the Budget/OPTAR Report
accomplished in time to be reflected in the Equipage
for March in accordance with NAVSUP P-485. When
Control/Redistribution Source Document. This
a shipwide or departmental inventory of controlled
7-8
|