c.
Additional Surveys
(1) AA&E Survey
(2) Residential Survey
(3) Barracks Survey
(4) MWR Facilities upon request
(5) Flight line
(6) Harbor
(7) Crime Prevention Survey
(8) Lighting Survey
d. Access Control/Pass and ID. Regional and Installation
commanders shall develop a system of personnel and vehicle
movement control in accordance with the sensitivity,
classification, value and operational importance of the area and
the requirements of OPNAVINST 5530.14 (series). These
regulations include a process for removal of, or denying access
to, persons who are not authorized or represent a criminal
threat. Clearly define the access control measures required to
safeguard facilities and ensure accomplishment of the mission.
These measures will be identified in installation AT plans, and
will be included in applicable departmental Rules, Regulations
and Procedures (RRP).
The following are some of the access control procedures which
may be used.
(1) During Heightened Force Protection Conditions,
access control is tightened and limited access measures are in
place. Installation-specific guidance will be contained in the
Anti-Terrorism Plan.
1-17