STATUS LISTINGS
As a source of data for re-computing repairable
allowances for activities that use manual procedures
Daily mechanized listings that provide complete
The NALCOMIS activities use conversation code
supply status for all NMCS/PMCS and anticipated
N201 to add new ICRL records to the database.
NMCS are provided by the program management unit
Conversation code N202 is used to update already
(PMU) to both the O- and I-level maintenance
established records or to delete an ICRL record.
activities in sufficient quantity to ensure adequate
Conversation code N222 is used to display the ICRL
distribution. Data is sequenced to expedite the daily
record of an item on the computer screen. Conversation
validation process. As a minimum, the listings contain
code N235 is used to request a printout of ICRL in the
the following information:
sequence selected by the user.
Document number
ORGANIZATION
Cognizant symbol (COG), material control code
(MCC), national stock number (NSN), and
The Aviation Support Division (ASD)/Supply
special material identification code (SMIC)
Support Center (SSC) is the contact point for supply
operations. It is the single contact point where material
Unit of issue and quantity
control centers of O- and I-level maintenance activities
Project and priority
place requirements for material and equipment required
for support of weapons systems maintenance. The
Bureau number
ASD/SSC consist of two sections--the supply response
section (SRS) and the component control section
Nomenclature
(CCS). Figure 10-1 shows the organization of the
ASD/SSC.
Status/Routing Identifier code (RIC) of activity
submitting status
Supply Response Section
Job control number (JCN)
The supply response section (SRS) is the single
Work Unit code (WUC)
point of contact for processing customer requirements
and providing follow-ups and status as required. The
Originator code of requisitioner
SRS is divided into five units: requisition control unit
The NALCOMIS activities can print NMCS/PMCS
(RCU), technical research unit (TRU), material delivery
High Priority Report. This report will list all requisitions
unit (MDU), pre-expended bin (PEB) unit, and program
selected by the user.
management unit (PMU).
An AWP status is provided weekly to the AIMD on
The SRS is responsible for the following:
a mechanized listing and contains, as a minimum, the
Processing material requirements
same information as the previous NMCS/PMCS status
listing, except the BUNO is replaced with the work
Maintaining control
center. The NALCOMIS activities can print the AWP
Repair Parts Status Report. This report lists all of the
Transmitting requests to other on-station supply
components that are AWP.
processing points as required
Delivering all parts and materials to customers
INDIVIDUAL COMPONENT
REPAIR LIST
Providing status on all requirements received
The Individual Component Repair List (ICRL)
Maintaining all aviation PEBs
contains the existing repair capability data on items
previously processed by the IMA. The supporting
Expediting all high-priority requisitions
supply activity is responsible for assisting IMA in
Reviewing and monitoring mailbox messages in
maintaining an accurate ICRL. The supporting supply
NALCOMIS
activity uses the ICRL for the following purposes:
To enter the repair capability code on local stock
Individual unit responsibilities of the SRS are listed
records
in the following paragraphs.
10-5